880-ICM project |
Alan Chow |
Functional requirements are under development as of November of
2007. These documents are estimated to be finalized in early
2008. |
|
TEMS |
Alan Chow |
This document
presents the functional requirements identified by the potential
users and stakeholders of the TOS asset management system.
Download PDF |
|
Regional HOT Lanes |
Lisa Klein |
Functional Requirements are not available at this time. |
|
Bay Area Video Upgrade (BAVU) |
Alan Chow |
The BAVU system will meet all and
only the system requirements listed in this document. This
document will be updated to reflect any approved changes made to
these requirements during the project lifecycle.
Download .doc |
|
SFgo |
Cheryl Liu |
SFgo Program Central System Software (CSS) Requirements Matrix
Download PDF |
|
SV-ITS West |
Ken Salvail |
Concept of Operations Report includes
Technical Requirements and
Alternatives
Download .doc |
|
East Bay Smart Corridors (INTEL) |
Frank Furger |
Systems Engineering Study for the East 14th Street,
International Blvd,
Telegraph Avenue Bus Rapid Transit project
Download PDF |
|
MY 511 (Web Interface) |
Jim Macrae |
Software Requirements Specification
Download .doc |
|
Real-Time Transit |
Jim Macrae |
This document presents the system
requirements for the Bay Area Regional Real-Time Transit
Information System. These set of the requirements are based on
the evaluation criteria developed for the selection of the
architecture, discussions with the MTC, the TAC and Telvent
Farradyne (TF), and on the existing procedures and features of
the existing real-time system.
Download PDF |
|
Transit Trip Planning Software |
Thomas
Spiekerman |
The Request for Qualifications (RFQ)
for Transit Trip Planning Software, including
Appendix C,
Trip Planning Software Functional Needs, that explains
the desired features and functions of the new transit trip
planning software system. Because the new trip planning software
is expected to be incorporated into the RTIS and use data
maintained in the Regional Transit Database (RTD), Appendix C
also describes the interface and data exchange requirements for
the new trip planning software.
Download PDF |
|
511 Regional Rideshare Program |
Emily van
Wagner |
Existing system attributes/functions are detailed in this SOP,
and it is understood that the system should maintain this
functionality unless otherwise approved by MTC.
Download
PDF |
|
Interim Center-to-Center System |
Jeff Georgevich |
This report presents a description
of the existing legacy systems that will participate in the
Interim Center-to-Center (C2C) System; identifies the functions
that are desired by each participating system; and presents a
Scope of Work for developing the Interim C2C System. Download PDF |